(1)
SYSTEM ANALYSIS OF THE ALTERNATIVE PROJECT CONFIGURATIONS OF THE AXIAL LINE OF THE ODESA SUBWAY. SBTA 2025, No. 12, 14-32. https://doi.org/10.31650/2786-6696-2025-12-14-32.